Z4 Tension Tie (T2)



Accurate Placement and Installation

Step 1: Use the two 3/16" holes provided to nail CT or T2 at desired location on wood member

Step 2: use the CT or T2 as a template to accurately drill holes for bolting

Step 3: Make bolted connections to the wood member per plans and specifications

Step 4: Make threaded rod connection per plans and specifications.




Save